MARRA BUILDERS, INC.
Philippines, ISO 9001:2015
Marra Builders Inc.
48 Daanghari St.
Navotas, NCR, Philippines 1485
Philippines
ph: (632) 351 11 01
fax: (632) 351 11 43
alt: (632) 351 10 65
jrramos
In 2016, Marra Builders, Inc. was awarded the contract for the design and construction of an LPG receiving jetty in Sariaya, Quezon. The jetty is primarily designed for 55,000 DWT vessel. The access trestle is 750-meter in length and the entire Jetty Facility, including the rock causeway, loading platform and steel catwalks were completed in 11 months.. Items of works also include the platform for file/spill protection as well as the fabrication and installation of the galvanized pipe racks. Trelleborg 100T Mooring Bollards and SCN Rubber Dock Fenders were used for this project. Completed on time and one budget.
WHEAT GRAIN TERMINAL (2015)
Brgy. Ingore, Iloilo
In 2015, the company was awarded the contract for the construction of a private port located at Brgy. Ingore, La Paz, Iloilo City. The port was designed for 50,000 DWT, upgradable to 60,000 DWTS vessel. The wharf facility has an area of 4,670 sq.m.., with a lengh of 230-meters. It features a 12-meter wide rock causeway and a 600-m access trestle. Crane rails were placed on the wharf for the placement of gantry/unloader cranes. M-Type fenders were used on the main berth and V=Type fenders were utilized for smaller-sized vessels. The project was completed in 13 months -- well within the allotted construction schedules.
CONSTRUCTION OF MATERIALS RECEIVING FACILITY (2013)
Calaca, Batangas
In 2013, Marra Builders, Inc. was awarded the contract for the design and construction of wharf primarily designed as a coal receiving facility. The project was completed in 13 months, 2 months ahead of schedule.
ABOUT THE IMAGES
The images are standard pictures taken from our accomplishment reports as submitted to our clients.
Please feel free to use the images for your reference, although the pictures are not copyrighted, we request all user to credit Marra Builders Inc. as the owner of the said images.
Disclaimer:
Our company accepts no liability for the use of the said images, copying, distribution or taking any action in reliance on the said contents, or for the consequences of any actions taken on the basis of the information provided, unless a written authorization is secured from Marra Builders, Inc.
San Rafael, Calaca, Batangas
In 2014, Marra Builders, Inc. was awarded the contract for the design and construction of a jetty port that serves as a liquid material receiving facility. The 30,000 DWT vessel capable jetty port has a draft of -11 meters M.L.L.W. The project was completed in only 8 months, 2 months ahead of our target date.
SURIGAO PORT EXPANSION PROJECT
Port of Surigao, Surigao City
Marra Builders, Inc. was awarded the contract for the construction of Surigao Port Expansion Project by the Philippine Ports Authority (PPA). Completed in 18 months, 6 months ahead of schedule. The work includes driving of prestressed concrete piles, concreting and rebar works for the superstructure, a Roro ramp facility, a back-up area, as well as the supply, installation and commissioning of the port's lighting facilities.
UBAY PORT EXPANSION PROJECT PHASE 1 (2010)
Port of Ubay, Bohol
Completed in 2010 as the first phase for the Port Expansion Project by the Philippine Ports Authority (PPA). The project features a ROro ramp, back-up area, port lighting system, pile driving of prestressed concrete piles, and 145,000 cubic meters of dredging works. The project was completed in 24 months. Marra Builders, Inc. has also managed to win and build Phase 2 of Ubay Development Project, again on schedule.
TACLOBAN PORT REHABILITATION PROJECT PHASE 1
Port of Tacloban, Tacloban City
The Port RehabilitationProject was completed in 16 months, 9 months ahead of schedule. The works include the demolition and excavation of the existing structure, pile driving of tubular sheet piles and concrete anchor piles, placement of steel tie rods, supply and placement of rocks on the sheet pile wall, correction dredging, supply and compaction of selected fill, a well as the supply and placement of interlocking paving blocks. A Roro ramp were also constructed for this project.
Please note that Phase 2 and 3 of the Tacloban Port Rehabilitation project were also built by Marra Builders, Inc. Phase 2 was finished ahead of schedule, and Phase 3, a month ahead of schedule.
Bringing our islands closer together, one port at a time.
Marra Builders Inc.
48 Daanghari St.
Navotas, NCR, Philippines 1485
Philippines
ph: (632) 351 11 01
fax: (632) 351 11 43
alt: (632) 351 10 65
jrramos